Arelsa Mühendislik

Think.Design.Apply.

Arelsa Mühendislik

Think.Design.Apply.

Batumi Stormwater Disposal Pumping Station – Batumi, GEORGIA

System Design 100%
Process Design 100%
Project Planning 100%
Cabinet Manufacturing 100%
PLC Logic 99%
Calibration 100%
SCADA Design 99%
Supervision 95%
Commissioning 93%
MCC Control Project 100%
0
Number of Motor
0
Number of Instrument
0
Number of Valve
10
Number of IO
0
Number of Station
  • PLC Group: ABB AC500 5 Set
  • Topology: Redundant-CPU, Redundant IO-Bus, Redundant DC-Bus, Redundant UPS, Redundant GPRS-Modem
  • IO Group: ABB AC500 2 Set
  • HMI: ABB
  • SCADA: ABB
  • Cabinets: EAE Moduler
  • LV Swichgears: EAE Panel Master Gold Form3B
  • MCC Cabinets: EAE Panel Master Gold Form3B
  • Instruments: Vega, Endress-Hauser
  • Electrical Equipments: ABB
  • Network: Moxa, Wireless
  • Aux. Equipments: Weidmuller