Hayges Solar Power Plant SCADA System- Kırıkkale / TURKEY

System Design 100%
Project Planning 100%
PLC Logic 100%
SCADA Design 100%
Commissioning 100%
0
Number of Solar Invertors
0
Number of PLC
0
SCADA Client
10
Number of IO
0
Communication Equipment

It was established in order to monitor and record 4 solar power plants with an installed power of 1 MW in real time, and to evaluate the fault tracking quickly, easily, effectively and retrospectively. In order to be able to communicate wirelessly with each of the 20 inverters per MW, a total of 86 wireless devices, 4 in the facility and the SCADA center, were used.

  • PLC Group:  Wago Exreme Condition
  • Solar Invertor Group:  Kaco Pawador
  • Network:  Wireless
  • SCADA:  Visu