Pfiffner Transformer Furnace Temperature, Vacuum SCADA System- Ankara / TURKEY
- Projects Main Menu
- Kirsehir Geothermal
- Bandirma Cement Factory
- Batumi Pumping Station
- Baskent Univercity Hospital
- Karakecili HEPP
- Hayges Solar Power Plant
- Ghana Clean Water Treatment
- Sema HEPP
- Timay Tempo Silverline Factory
- Pfiffner Transformer
- Bagram Air Base
- Iskilip State Hospital
- Dohuk Pump Stations
- Ziraat Bank Ulus Branch
System Design
100%
Project Planning
100%
PLC Logic
100%
SCADA Design
100%
Commissioning
100%
0
Number of Oven
0
Number of PLC
0
SCADA Client
10
Number of IO
0
Communication Equipment
The heating and vacuum process data of 7 transformer drying and 16 transformer curing furnaces are recorded via wireless communication, and the process type applied in the relevant furnace, start and end dates, process values and the serial code of the relevant transformer are transferred to the databases. In this way, an easy and effective quality policy is carried out in the factory.
- PLC Group: ABB
- IO Group: ABB
- Network: Wireless
- SCADA: Visu